Thursday, September 6, 2012

More milling!

I have a feeling we'll have a lot of posts with that title...

Jeremy spent 3 hours milling with Tim yesterday and produced most of our braces for the cabin and one of the posts (a 7"x10"x12' timber).  He also managed to move and restack all of that plus some other wood at the farm all by himself!  He impresses me constantly with his strength and determination.  No pictures were taken though, so you'll have to wait to see the results until we get back to the farm with a camera.  The stack of milled lumber is growing steadily!

Due to work schedules and school starting, things will be moving at a more scattered pace.  We will be creating our grape trellis, planting our front hedgerow and continuing to move rock and mill logs through the fall.  At some point when the weather gets too cold to work outside much, we'll shift and start doing the joinery for the cabin.  Lots in store, just not lots to report today. 

No comments:

Post a Comment